WWTP Trivières
Process : oxidation ditches Carrousel
Low speed surface AIRMAX and basic engineering
Quantity : 2
Diameter : 2.75m
Power : 75kw each
Aeration zone: completely covered
Process : oxidation ditches Carrousel
Low speed surface AIRMAX and basic engineering
Quantity : 2
Diameter : 2.75m
Power : 75kw each
Aeration zone: completely covered

Process: oxydation diches Carrousel
Low speed surface aerator AIRMAX
Quantity: 2
Diameter : 2.5m
Power : 45kw each
Aeration zone: completely covered
Application: municipal waste water

Process : Lagoon
Low speed surface aerator AIRMAX
Quantity: 6
Diameter : 2.1m
Power: 37kw each
Turnkey project including electrical cabinet and O2 management

Proces : MBR and complete mixed tank
with Nitrification/denitrification
Kamps delivered: Low speed surface aerator AIRMAX, full container with ZeeWeed membrane UF, electrical cabinet , O2management to spare energy
Turnkey project
Flow 15m³/h
Water reuse

Proces : MBR with nitrification denitrification
Membrane : ZeeWeed submerged
People equivalent: 30 000ie
Flow: 355m3/h
Turnkey for the complete filtration unit
Application: municipal waste water

Belt thickner
Belt width: 3m
Sludge concentration inlet: 1g/l
Sludge concentration outlet: 6g/l
Flow : 150m3/h
Application: municipal waste water

Process: oxidation ditches
Delivery: Low speed surface aerator AIRMAX and basic engineering
Quantity: 12
Application: municipal waste water

Process : lagoon
Low speed surface aerator: AIRMAX
Quantity: 16
Application: municipal waste water

Process :Toveko sand filter
Flow : 6 m3/h
SS out :< 10 mg/l
Application: heavy metals removal

Process :Toveko sand filter
Application: Drinking water producer : back-wash filtration
Flow : 30 m3/h
SS out :< 10 mg/l

Process : complete mixed tank
Delivery: AIRMAX
Installation: bridge
Quantity: 26
Application: municipal waste water

Process : lagoon
Delivery: Low speed surface aerator AIRMAX
Installation: floating
Quantity: 9
Application: municipal waste water

Process : complete mixed tank
Low speed surface aerator AIRMAX
Installation: concrete bridge
Quantity: 12
Application: municipal waste water
Process: piloting for screw press

Enginering and delivery: pumping station
Floating and flexible hoses on the river
Quantity : 18
Diameter: DN 900 for drinking water
Delivery of +/-10km submersible cable 300mm²
Proces : complete mixed tank
with Nitrification/denitrification
Replacement of high speed aerator
Low speed surface aerator AIRMAX
Number: 2
Diameter: 2.3m
Power: 55Kw

Dearator for power plant in Russland
Capacity :60T/h
Performance: < 20ppbO2/l
Application : waste water treatment palnt
Low speed surface aerator AIRMAX
Quantity : 6
Power: 75kw
WWTP for municipality
Delivery: Low speed surface aerator AIRMAX
Quantity: 10
Power 90kw
Municipal waste water treatment plant
Quantity: 8+8 aeration tank and aerobic digester
Power: 55kw and 37kw
Municipal waste water treatment plant.
One of the biggest plant in the world with low speed surface aerator AIRMAX
Quantity : 75
Deaerator for FPSO
Capacity : 150T/h
Performance < 20 ppbO2
Size: 500 pe
Process: MBR with ZeeWeed membrane, low speed surface aerator AIRMAX and very fine screening 1mm!
Effluent: swimming water quality
Flow: 13m³/h (rain water)
Landfill: ANTON
Process: nitrification+ denitrification+ activated carbon
Kamps delivery: membrane unit built on skid with ZeeWeed membrane